Utility Rate Comparisons

Survey of Canadian Electricity Bills — Effective May 1, 2014

Residential

General Service (Small Loads)

General Service (Medium Loads)

General Service (Large Loads)

General Service (Large Industrial Loads)

Population Statistics

Canadian Utilities Surveyed

Notes

Residential Bill Calculations
One Month Bill For:
Cities 375 kWh 750 kWh 1,000 kWh 2,000 kWh 5,000 kWh
Note:
  1. Calculations are based on the Calgary May 2014 Regulated Rate Option (RRO) energy charge of 10.612 ¢/kWh.
  2. Calculations are based on the Edmonton May 2014 Regulated Rate Option (RRO) energy charge of 8.922 ¢/kWh.
  3. Calculations are based on the average Time of USE (TOU) commodity price.
Calgary AB1  $72.08  $122.82  $156.64  $291.94  $697.83
Edmonton AB2  $62.59  $103.91  $131.44  $241.59  $572.04
Englehart ON3  $82.58  $142.56  $182.55  $342.49  $857.87
Halifax NS  $66.88  $122.93  $160.30  $309.77  $758.18
Kenora ON3  $68.34  $118.41  $151.80  $285.34  $715.65
Moncton NB  $57.77  $95.46  $120.58  $221.08  $522.58
Montreal QC  $33.08  $53.97  $70.58  $153.18  $400.98
Regina SK  $64.96  $109.70  $139.53  $258.84  $616.77
Saskatoon SK  $64.95  $109.67  $139.49  $258.76  $616.58
Saint John NB  $50.06  $84.68  $107.75  $200.05  $476.95
St. John's NL  $55.87  $96.30  $123.25  $231.06  $554.49
Toronto ON3  $70.19  $121.57  $155.82  $292.82  $747.31
Vancouver BC $34.92  $67.48  $97.07  $215.40  $570.41
Winnipeg MB $34.96 $62.64 $81.09 $154.90 $376.33

[ Back to List ]

Residential
Comparison at 1,000 kWh per Month
One Month Bill For:
Cities 1,000 kWh ¢/kWh
Englehart ON $182.55 18.255
Halifax NS  $160.30 16.030
Calgary AB  $156.64 15.664
Toronto ON  $155.82 15.582
Kenora ON  $151.80 15.180
Regina SK  $139.53 13.953
Saskatoon SK  $139.49 13.949
Edmonton AB  $131.44 13.144
St. John's NL  $123.25 12.325
Moncton NB  $120.58 12.058
Saint John NB  $107.75 10.775
Vancouver BC  $97.07 9.707
Winnipeg MB  $81.09 8.109
Montreal QC $70.58 7.058

Residential Comparison @ 1,000 kWh per Month - One Month Bill For Various Canadian Cities

[ Back to List ]

Residential
Comparison at 2,000 kWh per Month
One Month Bill For:
Cities 2,000 kWh ¢/kWh
Englehart ON $342.49 17.125
Halifax NS  $309.77 15.489
Toronto ON  $292.82 14.641
Calgary AB  $291.94 14.597
Kenora ON  $285.34 14.267
Regina SK  $258.84 12.942
Saskatoon SK  $258.76 12.938
Edmonton AB  $241.59 12.080
St. John's NL  $231.06 11.553
Moncton NB  $221.08 11.054
Vancouver BC  $215.40 10.770
Saint John NB  $200.05 10.003
Winnipeg MB  $154.90 7.745
Montreal QC  $153.18 7.659

Residential Comparison at 2,000 kWh per Month - One Month Bill For Various Canadian Cities

[ Back to List ]

Analysis of Residential Rates Ranked in Order of Run-Off Rate
Location No. of Blocks kWh in Block $ in Block Fixed Charges Run-Off Rate ¢/kWh Minimum Bill $
Note:
* Based on an average Regulated Price PlanTime of Use commodity price plus transmission, distribution charges and other regulatory charges. Does not include OCEB discount which is applied to the first 3,000 kWh/month.
** Does not include the 13.4% Distribution Access Service Adjustment Rider which is applied to the Distribution Charges portion of the bill.
*** Does not include the 5.0% Deferral Account Rate Rider which is applied to the total bill.
Englehart ON* 0 0 $0.00  $25.11 16.708 $25.11
Toronto ON* 0 0 $0.00 $21.21 14.969 $21.21
Halifax NS 0 0 $0.00  $10.83 14.947  $10.83
Kenora ON* 0 0 $0.00  $20.28 14.313  $20.28
Calgary AB** 0 0 $0.00  $19.70 13.417 $19.70
Regina SK 0 0 $0.00 $20.22 11.931  $20.22
Saskatoon SK 0 0 $0.00 $20.22 11.930 $20.22
Vancouver BC*** 1 675 $50.76  $5.06 11.270 $5.06
Edmonton AB 0 0 $0.00  $21.29 11.015 $21.29
St. John's NL 0 0 $0.00 $15.68 10.945 $15.68
Moncton NB 0 0 $0.00 $20.08 10.050 $20.08
Saint John NB 0 0 $0.00 $15.45 9.230  $15.45
Montreal QC 1 900 $50.13 $12.19 8.260 $12.19
Winnipeg MB 0 0 $0.00 $7.28 7.381 $7.28

[ Back to List ]

General Service (Small Loads) Bill Calculations
One Month Bill For:
Cities 6 kW (6.6 kVA)
750 kWh
7 kW (7.8 kVA)
1,000 kWh
20 kW (22.2 kVA)
5,000 kWh
40 kW (44.4 kVA)
10,000 kWh
Note:
  1. Calculations for loads ≤ 5,000 kWh are based on the Calgary May 2014 Regulated Rate Option (RRO) energy price of 10.612 ¢/kWh. Loads > 5,000 kWh are based on the average energy price as determined by the utility.
  2. Calculations are based on the Edmonton May 2014 Regulated Rate Option (RRO) energy charge of 8.922 ¢/kWh.
  3. Calculations are based on the Regulated Price Plan (RPP) Summer Tiered electricity price.
  4. Calculations are based on the Regulated Price Plan (RPP) Summer Time of USE (TOU) electricity price.
Calgary AB1 $144.38  $178.97  $732.42 $1,304.78
Edmonton AB2  $104.81  $135.29  $622.93  $1,232.48
Englehart ON3  $144.68  $183.92  $846.58  $1,718.50
Halifax NS  $126.57  $163.34  $769.20  $1,538.40
Kenora ON4  $128.77  $160.06  $688.39  $1,383.57
Moncton NB  $113.68  $144.45  $636.85  $1,270.35
Montreal QC  $82.68  $106.13  $481.33  $950.33
Regina SK  $112.44  $140.78  $594.18  $1,160.93
Saskatoon SK  $112.45  $140.79  $594.25  $1,161.06
Saint John NB  $112.59  $144.81  $622.01  $1,228.11
St. John's NL  $102.30  $129.21  $590.51  $1,139.15
Toronto ON4  $139.52  $175.33  $794.32  $1,601.81
Vancouver BC  $86.49  $113.06  $538.10  $1,014.75
Winnipeg MB  $77.87  $97.25  $407.33  $794.93

[ Back to List ]

General Service (Small Loads)
Comparison at 1,000 kWh per Month
One Month Bill For:
Cities 7 kW (7.8 kVA)
1,000 kWh
¢/kWh
Englehart ON $183.92 18.392
Calgary AB  $178.97 17.897
Toronto ON  $175.33 17.533
Halifax NS  $163.34 16.334
Kenora ON  $160.06 16.006
Saint John NB  $144.81 14.481
Moncton NB  $144.45 14.445
Saskatoon SK  $140.79 14.079
Regina SK  $140.78 14.078
Edmonton AB  $135.29 13.529
St. John's NL  $129.21 12.921
Vancouver BC  $113.06 11.306
Montreal QC  $106.13 10.613
Winnipeg MB $97.25 9.725

General Service Small Loads Comparison at 1,000 kWh per Month - One Month Bill For Various Canadian Cities

[ Back to List ]

General Service (Small Loads)
Comparison at 5,000 kWh per Month
One Month Bill For:
Cities 20 kW (22.2 kVA)
5,000 kWh
¢/kWh
Englehart ON  $846.58 16.932
Toronto ON  $794.32 15.886
Halifax NS  $769.20 15.384
Calgary AB  $732.42 14.648
Kenora ON  $688.39 13.768
Moncton NB  $636.85 12.737
Edmonton AB  $622.93 12.459
Saint John NB  $622.01 12.440
Saskatoon SK  $594.25 11.885
Regina SK  $594.18 11.884
St. John's NL  $590.51 11.810
Vancouver BC  $538.10 10.762
Montreal QC  $481.33 9.627
Winnipeg MB  $407.33 8.147

General Service Small Loads Comparison at 5,000 kWh per Month - One Month Bill For Various Canadian Cities

[ Back to List ]

General Service (Medium Loads)
One Month Bill For:
Utility-Owned Transformation Service at less than 750 Volts
90% Power Factor
Utility 100 kW (111 kVA)
25,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. Summer/Winter average bill.
Hydro One Networks Inc.1 $4,108 16.432
Nova Scotia Power   $3,846 15.384
Toronto Hydro-Electric System Ltd.1  $3,786 15.144
Kenora Hydro1   $3,716 14.864
NB Power $3,171 12.684
Saskatoon Light & Power  $3,076 12.304
SaskPower $3,075 12.300
Saint John Energy  $3,046 12.184
ENMAX Corporation1  $2,988 11.952
Newfoundland Power2  $2,921 11.684
Hydro Quebec  $2,585 10.340
BC Hydro  $2,510 10.040
Manitoba Hydro $2,080 8.320
General Service (Medium Loads)
One Month Bill For:
Utility-Owned Transformation Service at less than 750 Volts
90% Power Factor
Utility 300 kW (333 kVA)
120,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. Summer/Winter average bill.
Hydro One Networks Inc.1  $16,877 14.064
Toronto Hydro-Electric System Ltd.1  $15,877 13.231
Nova Scotia Power   $15,391 12.826
Kenora Hydro1   $14,975 12.479
NB Power  $13,434 11.195
ENMAX Corporation1  $13,431 11.193
Saint John Energy  $12,964 10.803
Saskatoon Light & Power  $12,186 10.155
SaskPower  $12,185 10.154
Newfoundland Power2  $12,158 10.132
Hydro Quebec  $9,873 8.228
BC Hydro  $9,139 7.616
Manitoba Hydro $7,482 6.235
General Service (Medium Loads)
One Month Bill For:
Utility-Owned Transformation Service at less than 750 Volts
90% Power Factor
Utility 500 kW (556 kVA)
200,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. Summer/Winter average bill.
Hydro One Networks Inc.1  $28,090 14.045
Toronto Hydro-Electric System Ltd.1  $26,426 13.213
Nova Scotia Power   $25,652 12.826
Kenora Hydro1   $24,609 12.305
NB Power  $22,388 11.194
ENMAX Corporation1  $22,024 11.012
Saint John Energy  $21,596 10.798
Saskatoon Light & Power  $20,317 10.159
SaskPower  $20,316 10.158
Newfoundland Power2  $19,656 9.828
Hydro Quebec  $16,455 8.228
BC Hydro  $15,310 7.655
Manitoba Hydro $12,350 6.175

[ Back to List ]

General Service (Large Loads)
One Month Bill For:
Customer-Owned Transformation Service at Distribution Voltage less than 30 kV
90% Power Factor
Utility 1,000 kW (1,111 kVA)
400,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. Summer/Winter average bill.
Toronto Hydro-Electric System Ltd.1 $51,299 12.825
Hydro One Networks Inc.1  $47,322 11.831
ENMAX Corporation1  $43,431 10.858
Nova Scotia Power   $42,889 10.722
SaskPower  $37,801 9.450
Saskatoon Light & Power  $37,788 9.447
Newfoundland Power2  $36,822 9.206
NB Power  $34,551 8.638
Saint John Energy  $32,580 8.145
BC Hydro  $30,478 7.620
Hydro Quebec  $29,517 7.379
Manitoba Hydro $21,933 5.483
General Service (Large Loads)
One Month Bill For:
Customer-Owned Transformation Service at Distribution Voltage less than 30 kV
90% Power Factor
Utility 5,000 kW (5,556 kVA)
2,555,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. An interruptible credit has been applied.
  3. Summer/Winter average bill.
Toronto Hydro-Electric System Ltd.1 $310,995 12.172
Hydro One Networks Inc.1  $289,697 11.338
ENMAX Corporation1  $266,535 10.432
Nova Scotia Power2  $236,683 9.264
Newfoundland Power3  $221,190 8.657
Saskatoon Light & Power  $208,605 8.165
SaskPower  $204,902 8.020
NB Power  $200,074 7.831
Saint John Energy  $189,818 7.429
BC Hydro  $181,187 7.091
Hydro Quebec  $132,696 5.194
Manitoba Hydro $128,204 5.018
General Service (Large Loads)
One Month Bill For:
Customer-Owned Transformation Service at Distribution Voltage less than 30 kV
90% Power Factor
Utility 10,000 kW (11,111 kVA)
5,500,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. An interruptible credit has been applied.
  3. Summer/Winter average bill.
Toronto Hydro-Electric System Ltd.1 $663,754 12.068
Hydro One Networks Inc.1  $618,102 11.238
ENMAX Corporation1  $568,990 10.345
Nova Scotia Power2   $502,221 9.131
Newfoundland Power3  $470,561 8.556
Saskatoon Light & Power  $434,293 7.896
SaskPower  $426,884 7.762
NB Power  $398,150 7.239
BC Hydro  $382,396 6.953
Hydro Quebec  $278,028 5.055
Manitoba Hydro $269,422 4.899

[ Back to List ]

General Service (Large Industrial Loads)
One Month Bill For:
Customer-Owned Transformation Service at Transmission Voltage Exceeding 100 kV
100% Power Factor
Utility 20,000 kW / kVA
12,000,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. An interruptible credit has been applied.
  3. Summer/Winter average bill.
  4. Does not include annual charges for customer plant in service that may apply to specific customers.
* Billed by the Independent Electricity System Operator (IESO).
Toronto Hydro-Electric System Ltd.1 $1,416,180 11.801
Hydro One Networks Inc.1*  $1,264,527 10.538
Nova Scotia Power2   $1,059,420 8.829
Newfoundland Power3  $994,334 8.286
NB Power  $844,800 7.040
SaskPower  $757,657 6.314
BC Hydro  $656,859 5.474
Hydro Quebec  $577,056 4.809
Newfoundland & Labrador Hydro4  $574,720 4.789
Manitoba Hydro $478,680 3.989
General Service (Large Industrial Loads)
One Month Bill For:
Customer-Owned Transformation Service at Transmission Voltage Exceeding 100 kV
100% Power Factor
Utility 50,000 kW / kVA
31,000,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. An interruptible credit has been applied.
  3. Does not include annual charges for customer plant in service that may apply to specific customers.
* Billed by the Independent Electricity System Operator (IESO).
Toronto Hydro-Electric System Ltd.1 $3,637,342 11.733
Hydro One Networks Inc.1*  $3,258,961 10.513
Nova Scotia Power2  $2,722,560 8.782
NB Power  $2,160,500 6.969
SaskPower  $1,934,987 6.242
BC Hydro  $1,684,767 5.435
Hydro Quebec  $1,474,340 4.756
Newfoundland & Labrador Hydro3  $1,473,560 4.753
Manitoba Hydro $1,226,790 3.957
General Service (Large Industrial Loads)
One month bill for:
Customer-Owned Transformation Service at Transmission Voltage Exceeding 100 kV
100% Power Factor
Utility 100,000 kW / kVA
62,000,000 kWh
¢/kWh
Note:
  1. These utilities have unbundled rates in which energy is priced separately and varies over the course of a year. Bills are based on the average energy price as determined by the corresponding utility.
  2. An interruptible credit has been applied.
  3. Does not include annual charges for customer plant in service that may apply to specific customers.
* Billed by the Independent Electricity System Operator (IESO).
Toronto Hydro-Electric System Ltd.1 $7,271,482 11.728
Hydro One Networks Inc.1*  $6,517,921 10.513
Nova Scotia Power2   $5,445,120 8.782
NB Power  $4,321,000 6.969
SaskPower  $3,863,217 6.231
BC Hydro  $3,369,534 5.435
Hydro Quebec  $2,948,680 4.756
Newfoundland & Labrador Hydro3  $2,947,120 4.753
Manitoba Hydro $2,453,580 3.957

[ Back to List ]

Population Statistics
Location Population Metro Population
Source: Statistics Canada 2011 Census website
Calgary AB 1,096,833 1,214,839
Edmonton AB 812,201 1,159,869
Englehart ON 1,519
Halifax NS 390,096 390,328
Kenora ON 15,348 15,348
Moncton NB 69,074 138,644
Montreal QC 1,649,519 3,824,221
Regina SK 193,100 210,556
Saint John NB 70,063 127,761
Saskatoon SK 222,189 260,600
St. John's NL 106,172 196,966
Toronto ON 2,615,060 5,583,064
Vancouver BC 603,502 2,313,328
Winnipeg MB 663,617 730,018

[ Back to List ]

Canadian Utilities Surveyed
Location Utility
* Only Large Industrial Rates (20,000 kW & >) provided for the Island interconnected area.
Calgary AB ENMAX Corporation
Edmonton AB EPCOR Energy Alberta Inc.
Englehart ON Hydro One Networks Inc.
Halifax NS Nova Scotia Power
Kenora ON Kenora Hydro
Moncton NB NB Power
Montreal QC Hydro Quebec
Regina SK SaskPower
Saint John NB Saint John Energy
Saskatoon SK Saskatoon Light & Power
St. John's NL Newfoundland Power
St. John's NL* Newfoundland & Labrador Hydro
Toronto ON Toronto Hydro-Electric System Ltd.
Vancouver BC BC Hydro
Winnipeg MB Manitoba Hydro

Notes

  1. Each participating utility calculates bills based on its rates as of May 1, 2014.
  2. All bills exclude federal, provincial or municipal taxes. Newfoundland Power does however include a Municipal Tax and Rate Stabilization Adjustment which is built into their rates.
  3. Ontario – The Ontario Clean Energy Benefit (OCEB) 10% discount is applied on the first 3,000 kWh/ month for both Residential and General Service (Small loads). The OCEB is applied before taxes by Hydro One Networks Inc and Kenora Hydro and after taxes by Toronto Hydro.