Transcona gate station upgrade project

More in this section

The Transcona gate station project will replace or update the existing natural gas equipment and structures, and install new operation controls.

The station is located near the intersection of Dugald Road and Plessis Road in Winnipeg and supplies natural gas to around 40,000 customers in east Winnipeg.

Green rectangle shows the location of the Transcona gate station on Dugald Rd.

Map of the Transcona gate station yard.

Enlarge image: Green rectangle shows the location of the Transcona gate station on Dugald Rd.

Improvements

A wire fence surrounds 3 buildings and natural gas pipes in a muddy field.

The Transcona gate station will replace existing buildings with a new structure and update its equipment and controls.

Enlarge image: A wire fence surrounds 3 buildings and natural gas pipes in a muddy field.

Upgrading the station equipment will reduce the chance of equipment failure and enhance reliability for our customers. The new operation controls will allow us to monitor the station remotely, adjust the system more efficiently, and quickly identify and respond to potential problems.

The existing structures will be removed and replaced with a larger single-storey structure. Some of the natural gas piping will be replaced and moved inside the new structure.

During construction

No natural gas outages will occur during this work. The Transcona gate station will be temporarily shut down for the project and other Winnipeg stations will provide natural gas for the area.

Nearby residents can expect some noise from materials delivery, large equipment, existing piping and structures removal, and excavation, welding, and screw piling for the new equipment and structure.

UPDATED Construction is scheduled for Monday through Friday, and most Saturdays, between 8:00 a.m. to 6:00 p.m. However, some work may happen outside this time frame.

Schedule

  • Preliminary worksite and equipment preparation: May 2022;
  • Construction start: June 2022;
  • Target in-service date: fall 2022.

Stay in the loop

Sign up for email updates about the Transcona gate station upgrade project:

Loading…

Contact us

For more information about the Transcona gate station upgrade project, email us.