More in this section We will give you a response letter for any project near or over natural gas infrastructure. Complete and submit this application and your request will be processed. * = Required field Project information Third party file no. Project name Project location address * (legal description; LSD; civic address; lot block plan; river lot; section township range) City, town, or municipality Proposed installation date * Contact information Business name * Name * Mailing address * City, town, or municipality * Postal code * Phone * Email * Project description Description of work * Have you incorporated gas-as-built drawings into your construction plans? Yes No Are you working within 3.0 metres of a transmission-pressure natural gas main? Yes No Are you working within 3.0 metres of a high-pressure natural gas main? Yes No Are you working within 1.0 metre of a distribution-pressure natural gas main of 114.3 mm size or smaller? Yes No Are you working within 1.0 metre of a distribution-pressure natural gas main of 168.3 mm size or larger? Yes No Are you working within 30 metres of the Minell Pipeline? Yes No Check off all types of work that apply to your project: concrete road reconstruction sidewalk renewals asphalt overlay utility installation open cut/trench directional drill culvert installation within 1.0 m of a gas main Does the proposed work include installation or removal of objects within 1.0 m of gas mains? (e.g. catch basins, manholes, subdrains etc.) Yes No Does the proposed work include the installation or removal of trees? Yes No Does the proposed work include construction of a building (house, shed, commercial building, etc.)? Yes No Are you working within 3.0 m of any gas main outside of public right-of-way? Yes No Does your project require infrastructure to be installed inside of Manitoba Hydro’s easement limits? Yes No Is this project completed by or for Manitoba Transportation & Infrastructure? Yes No Is blasting required (or any disturbance that may affect existing infrastructure)? Yes No Will screw piles be installed within 3.0 metres of a natural gas main? Yes No Will driven piles be installed within 5.0 metres of a natural gas main? Yes No Does equipment cross any gas main outside of a paved municipal roadway? Yes No Do you expect that there will be interference with proposed installations and existing gas mains, and that relocation or lowering of gas facilities will be required? Yes No Will grading or ground elevations changes occur such that there will be insufficient cover over any gas facilities? Yes No Gas main crossing Utilities or other infrastructure will cross a natural gas main within a public ROW * Yes No Utilities or other infrastructure will cross a natural gas main outside a public ROW * Yes No Depth of existing natural gas mains The depth of all gas facilities must be determined before any works begin. If the minimum depth of cover cannot be met, then relocations or lowerings may be required. Timelines for this work are included in our checklist. The natural gas mains in project area will meet minimum depths of cover requirements (PDF, 56 KB) when work is complete. * Yes No Unknown Temporary vehicle or equipment crossings Only Manitoba Hydro-approved vehicles are permitted to cross natural gas lines. Select all equipment and vehicles that will cross a natural gas main outside a paved municipal roadway. wheeled vehicles Vehicle description (make, model, year) Maximum axle load (kg) Add another vehicle Vehicle description (make, model, year) Maximum axle load (kg) Add another vehicle Vehicle description (make, model, year) Maximum axle load (kg) Add another vehicle Vehicle description (make, model, year) Maximum axle load (kg) tracked vehicles Vehicle description (make, model, year) Vehicle operating weight (kg) Length of track on the ground (metre) Track shoe width (metre) Add another vehicle Vehicle description (make, model, year) Vehicle operating weight (kg) Length of track on the ground (metre) Track shoe width (metre) Add another vehicle Vehicle description (make, model, year) Vehicle operating weight (kg) Length of track on the ground (metre) Track shoe width (metre) Add another vehicle Vehicle description (make, model, year) Vehicle operating weight (kg) Length of track on the ground (metre) Track shoe width (metre) Required documents Your application will not be processed without your documents. Upload all required documents including: construction plans; detailed description of items planned to be installed outside of public ROW (if project requires infrastructure construction at this location); map of temporary vehicle and equipment access routes with crossings clearly marked. Attach all documents: * PDF, DOC, DOCX, XLS, XLSX, CSV, TXT, RTF, JPG, BMP, GIF, or PNG format only. While Manitoba Hydro has taken all reasonable efforts to ensure the security of information in transit to Manitoba Hydro, it is not liable for any damages that may arise as the result of interception, loss, theft, or other action or difficulty. After you complete a secure transaction, you should clear the browser cache. Information stored in the browser cache isn’t encrypted. By clearing it, you help to ensure that others can’t compromise your data.