Oil field service application

More in this section

To connect new electrical or natural gas service, or make changes to your existing service to an existing or new oil field, complete and submit this application.

* = Required field

Project information


(legal description; LSD; civic address; lot block plan; river lot; section township range)


If you are unsure of your Customer Service Centre, find it here.

Choose the type of service request

Type of service request *


Choose all your service requirements


Contact information

This application is being submitted by: *
We will contact the person who submitted this form. Choose a contact option: *
Owner (customer)
Electrical contractor

Oil field information

Number of wells
Load description (total HP)

Electric service information

Type of electric service
Preferred voltage



Manitoba Hydro supply voltages

Electric loading information

Electric loading information
Fault currents required

Non-linear load information (if applicable)

Variable frequency drive
Phase converter

Natural gas service information

Complete the natural gas load summary (Excel, 17 KB) with a detailed list of mechanical loads. Upload as a Microsoft Excel (XLS or XLSX) file format only.

Provide a breakdown of the following mechanical loads, if applicable
Pressure requested

Required documents

Upload all applicable documents to help us with the plan and design of your request, including:

  • site plan;
  • electric loading breakdown, including single line diagram;
  • natural gas load summary.

Your application will not be processed without all applicable documents. Do not attach your AutoCAD file. Your energy services advisor will contact you to finalize your application and request your AutoCAD file.

Your site plan should tie the site to adjacent surveyed section lines and road allowances, and must show the battery sites, lease site and roads, and the pipeline right-of-way.


PDF, DOC, DOCX, XLS, XLSX, CSV, TXT, RTF, JPG, BMP, GIF, or PNG format only. While Manitoba Hydro has taken all reasonable efforts to ensure the security of information in transit to Manitoba Hydro, it is not liable for any damages that may arise as the result of interception, loss, theft or other action or difficulty. After you complete a secure transaction, you should clear the browser cache. Information stored in the browser cache isn’t encrypted. By clearing it, you help to ensure that others can’t compromise your data.

Terms and Conditions

Terms and Conditions

Personal information is being collected for the purpose of installing electric or natural gas service(s), to a new or existing areas as requested by a new or existing customer. It is protected by the Protection of Privacy provisions of The Freedom of Information and Protection of Privacy Act (FIPPA). If you have any questions about the collection, contact the Access and Privacy Coordinator at Manitoba Hydro, 360 Portage Ave. (22), Winnipeg MB R3C 0G8, or telephone 204-480-5900 (Winnipeg) or 1-888-624-9376 (toll free).